Product Descriptions
Manufacturing Process
Cutting board----- Bending----- Welding----- Polishing----- Powder Coating-----Assembling
Cutting board
Sheet metal workers in the workshop begin to cut the whole board into the required specifications according to the production drawings.
Bending
Sheet metal workers will cut the sheet, according to the specifications of the production drawings, bending the required workpiece as required.
Welding
After the bending, the welder will weld the parts prepared by the sheet metal worker according to the drawing requirements.
Polishing
After welding forming, go to the next polishing process, and the polishing worker will polish the welding spot on the welded forming workpiece smoothly.
Powder Coating
After the above procedures, the product began to take shape, and was put to the designated place for plastic spraying.
Assembling
After the production team's hard work, the product is assembled and formed, after quality inspection, packaging, warehousing.




O&A
Q1. Are you a factory?
A: We are a factory. We provide trash bin, mailbox, led light box, sign board and so on.
Q2. Why choose us?
A: We offer high quality products with extremely competitive prices and timely delivery.
Q3. How do you ensure quality control?
A: Quality is priority. We have professional QC and inspection team to check the quality after production.
Q4. How about your delivery time?
A: It depends on your order quantity. For small or stock orders, we can deliver the goods within a week after received the payment.